Ethan Howland
Senior Reporter | @ethanhowland27Senior Reporter Ethan Howland covers the Federal Energy Regulatory Commission, Congress and electricity markets for Utility Dive. His award-winning work covers utility finance, emerging public policy, state and federal legislation and regulation, project development and infrastructure, legal and environmental issues. He’s been covering the power sector for more than two decades from his home in Portland, Maine. You can contact him at [email protected] or on LinkedIn.
1256 articles by Ethan Howland
-
Advanced transmission projects get $1.9B in DOE funding
Sept. 24, 2026 -
FERC rejects ComEd’s cancellation of PowerHouse Hillwood data center contract
Sept. 23, 2026 -
Other New England states back Maine’s RTO adder complaint
Sept. 22, 2026 -
Federal judge restores $7B Solar for All program, says EPA illegally axed it
Sept. 21, 2026 -
House passes ratepayer protection bill to limit data center cost shifts
Sept. 17, 2026 -
Court rejects DOE ‘emergency’ order delaying coal plant retirement as overstep
Sept. 11, 2026 -
Unplanned power plant outages fell sharply during 2025/26 winter storms: FERC-NERC report
Sept. 11, 2026 -
Google, Xcel, others back MISO’s ‘zero injection’ large-load proposal
Sept. 9, 2026 -
Bonneville eyes switch to CAISO’s EDAM from Southwest Power Pool’s Markets+
Sept. 8, 2026 -
Transmission expansion could spur billions in savings, especially in PJM: study
Sept. 2, 2026 -
Large loads face reliability requirements under MISO proposal
Sept. 1, 2026 -
PJM drops Oklo advanced nuclear project from interconnection study cycle
Aug. 31, 2026 -
Ohio ratepayer advocate urges FERC to resolve 3-year-old local transmission complaint
Aug. 28, 2026 -
Data center load made up 9% of PJM wholesale costs so far in 2026: market monitor
Aug. 27, 2026 -
Microsoft, PowerHouse Hillwood dispute data center service agreements
Aug. 24, 2026 -
PJM eyes option to jumpstart surplus interconnection pathway
Aug. 21, 2026 -
FERC approves SPP ‘topology optimization’ plan for cutting grid congestion
Aug. 20, 2026 -
Pennsylvania dangles permitting carrot for data centers that bring their own power
Aug. 19, 2026 -
ISO-NE to review ‘asset condition’ transmission projects under proposal filed at FERC
Aug. 18, 2026 -
FERC approves MISO cost recovery plan for transmission projects built in PJM
Aug. 17, 2026 -
FERC approves TransAlta, PowerTransitions gas-fired power plant deals
Aug. 14, 2026 -
Xcel asks Colorado Supreme Court to facilitate wind farm interconnection
Aug. 12, 2026 -
PJM eyes data center, crypto reliability requirements after 3.8 GW of load trips offline
Aug. 12, 2026 -
PPL-Blackstone joint venture secures 5 GW of gas turbines for data centers in Pennsylvania
Aug. 10, 2026 -
Constellation CEO: Existing power plants are ‘bedrock’ in supplying data centers
Aug. 7, 2026